January 2022

All work was neat and surfaces covered, no loud music and even made their own tea!

After a delay to the start the execution was faultless. Arrived at 8am every day and left at 4pm. 10 windows and 2 doors in 10 days including a rebuild of a very old window outside the quote. The latter was priced and extra timber acquired. All work was neat and surfaces covered, no loud music and even made their own tea!